• Rehearse Timing (2003)

    Author
    Topic
    #431940

    Hi
    I have put together a slide show which has 267 slides, my problem is that I have several times gone through it to rehearse the timing, however during the last one I got all the timing right except for the third and second last slides. Is there a way that I can go back to the rehearse timing but move forward to the slides that I need to adjust the timing on or do I have to start all over again.

    Oh and one other thing, is it possible to convert the slide show to a movie type format (eg AVI MPG4 etc)

    Thanks in advance

    Viewing 1 reply thread
    Author
    Replies
    Viewing 1 reply thread
    Reply To: Rehearse Timing (2003)

    You can use BBCodes to format your content.
    Your account can't use all available BBCodes, they will be stripped before saving.

    Your information: